BH-360 PWC Lift Ride Pipe
- Made from hot-dipped galvanized steel
- (3) welded tabs, (4) mounting holes
- Minimum 18 in. into clay bottom
- Round pipe in air
- Mounts to piling and dock
- Not all tabs have to be used
- Ships loose freight only
BH-360 PWC Lift Ride Pipe
The BH-360 PWC Lift Ride Pipe includes welded tabs to allow mounting to the piling and to the dock mount plate. During installation, the pipe should penetrate a clay bottom by at least 18 inches. The square tubing goes into the clay bottom with the round pipe in the air.
There are (4) machine-punched 1/2 in mounting holes on the (3) welded tabs. It’s not uncommon to install the ride pipe without utilizing all three tabs. To attach to the dock surface, use the top tab closest to the round pipe.
Made from hot-dipped galvanized steel. Constructed from 4 x 4 square tubing. The round pipe and tabs are welded to the square tubing. There are seven inches between the collar and the first welded tab. There are 20 inches between the first tab and the second tab. There are 27 inches between the second tab and the bottom tab.